Lisbon Zoo

Built: Lisbon Zoo’s dolphinarium opened in May 1995

Depth: ?

Temperature: ?

Total amount of water: more than 4000 cubic meters of water

Pools: the dolphinarium consists of 4 pools

Dolphin therapy: ?

 

Lisbon Zoo’s dolphinarium opened in May 1995. The dolphinarium consists of 4 pools; 1 large and 2 smaller plus one medical pool where the water level can be lowered and where it is possible to lift the dolphins out of the water. Lisbon Zoo does not use chlorine to clean the water in the dolphinarium.

Copyright © Alltomdelfiner.se 2007-2010 info@alltomdelfiner.se