Built:
Lisbon Zoo’s dolphinarium opened in May 1995
Depth: ?
Temperature:
?
Total
amount of water: more than 4000 cubic meters of water
Pools:
the dolphinarium consists of 4 pools
Dolphin
therapy: ?
Lisbon
Zoo’s dolphinarium opened in May 1995. The dolphinarium consists of 4 pools; 1
large and 2 smaller plus one medical pool where the water level can be lowered
and where it is possible to lift the dolphins out of the water. Lisbon Zoo does
not use chlorine to clean the water in the dolphinarium.












